Industrial Estate

 

NO

PROJECT NAME

CLIENT

SERVICES

PERIOD

 1

The Feasibility Study of East Access Road Phase II, KIIC Industrial Estate

PT. Harapan Anang Bakri

Feasibility Study

Sep-16

 -

 Nov-16

2

Consulting Services of SW Corner Slope Stability of GT Tyre Land Area

PT. Gajah Tunggal Tbk. Review Design Jul-16 - Oct-16

3

Consulting Services on Study for Area of 270 Ha in KIIC Industrial Estate PT. Karawang Tatabina Master Plan Jan-16 - Jun-16

4

Supplementary Study for Geotechnical Investigation and Drainage System for PT. Krakatau Osaka Steel Project PT. PP-Taisei Ind. Construction Study Nov-15 - Dec-15

5

The Construction Supervision of Land Development Area of 160 Ha at Karawang Barat - West Java PT. Karawang Tatabina Construction Supervision Oct-15 - Oct-16

6

The Preparation of Master Plan for the Land Development of 80 Ha in Phase I of KIIC Industrial Estate

PT. Maligi Permata Industrial Estate

Master Plan

Jul-15

 -

 Oct-15

7

Preparation of Detailed Design of Infrastructure Facilities of 750 Ha at JIIPE Area

PT. BKMS

Detailed Design

Aug-15

 -

 Nov-15

8

Geotechnical and Embankment Material Survey and Related Study for Land Reclamation in Ancol Area in Jakarta-Indonesia

Nippon Koei Co., Ltd

Geotechnical Survey

Jun-15

 -

 Aug-15

9

Construction Supervision for the Handling of Slope Sliding at KITIC Industrial Area, Deltamas City

KITIC

Construction supervision

Jul-15

 -

 Dec-15

10

Design and Procurement for the Handling of Slope Sliding at KITIC Industrial Area, Deltamas City 

KITIC

Design and Procurement

Jun-15

 -

 Jul-15

11

Consulting Services of Construction Supervision of Karawang Industrial Park_Add No.3

PT. IPP

Construction Supervision

Jul-15

 -

 Jun-15

12

Preparation of Pavement Design Criteria of External Road (Heavy Duty) for PT. Krakatau Steel Project

PT. PP-Taisei Ind. Construction

Detailed Design

Apr-15

 -

 May-15

13

Review Master Plan of Port Development for JIIPE Project

PT. Berlian Manyar Sejahtera

Review Master Plan

May-15

 -

 Sep-15

14

Design Review of Land Development Area of 160 Ha of KIIC Area KIIC Design Review Jan-15   May-15

 15

Preparation of Master Plan of Ceres Industrial Estate, 30 Ha in Karawang, West Java

PT. Perusahaan Industri Ceres

Master Plan

Jan-15

 -

Feb-15

16

The Construction Supervision of the Warehouse at KITIC Area in Bekasi of West Java

 KITIC

 Construction Supervision

Dec-14

 -

 Oct-15

17

Detailed Design of The Conveyance Pipe Line Installation from Sembayat Weir to JIIPE Area

PT. Berkah Kawasan Manyar Sejahtera

Detailed Design

Sep-14

 -

 Feb-15

18

Preparation of Detailed Design of Karawang Barat Industrial Estate 350 Ha, Karawang - West Java

PT. Agung Podomoro Land

Detailed Design 

Aug-14

 -

 Mar-15

19

Construction Supervision for Greenland International Industrial Center (GIIC) Development in Cikarang, Indonesia

Nippon Koei Co., Ltd

Construction Supervision

Aug-14

 -

 Dec-14

20

Topographic Survey (± 350 Ha) PT. SAMP at Karawang-West Java

PT. Agung Podomoro Land

Topographic Survey

Jul-14

 -

 Sep-14

21

Preparation of Detailed Design of Karawang Barat Industrial Estate 216 Ha, Karawang-West Java

PT. Agung Podomoro Land   Detailed Design

Jul-14

 -

 Jan-15

22

Dispatching Staff for Design Review (213 Ha) of Deltamas Estate

 Nippon Koei Co., Ltd Design Review

Apr-14

 -

 Jul-14

23

Construction Supervision of Karawang Industrial Park (± 400 Ha) at Karawang, West Java - Indonesia_Add. No. 2

PT. Bintang Puspita

Construction Supervision

Mar-14

 -

 Dec-14

24

Additional Capacity of Water Treatment Plant of Sampora at BSD City - Tangerang

 PT. Bumi Serpong Damai - Sinarmas Land

Construction Supervision 

Feb-14

 -

 May-14

25

Construction Supervision of Temporary Access Road of Java Intergrated Industrial and Estate in Gresik - Lamongan, East Java

PT. Berkah Kawasan Manyar Sejahtera

Construction Supervision

Jul-13

 -

Oct-14

26 Engineering Services of the Design, Procurement and Monitoring During Construction Stage for Jababeka Warehouse (22,000 Sq.m) Warehouse II (15,000 Sq.m) + Cold Storage Building (10 x 25 Sq.m) at Cikarang Dry Port, Bekasi - West Java PT. Gerbang Teknologi Cikarang Design, Procurement and Monitoring During Construction Stage May-13 - Jul-13
27 Detailed Design Engineering and Procurement of stage-1 (790 Ha) an Industrial Estate of Java Integrated Industrial and Ports Estate in Gresik - East Java PT. Berkah Kawasan Manyar Sejahtera DED & Procurement Apr-13 - Apr-14
28 Detailed Design NGK Warehouse Project + Extension Takenaka Detailed Design Mar-13 - Jun-13
29 Improvement Planning WTP Intake Sampora, BSD City, Serpong PT. Bumi Serpong Damai - Sinarmas Land Detail Engineering Design Mar-13 - Oct-13
30 Engineering Services for The Preparation of Master Plan of Blue Ocean Project (3000 Ha) at Lamongan, East Java, Indonesia PT. Berkah Kawasan Manyar Sejahtera Master Plan Oct-12 - Apr-13
31  Master Plan & Detailed Design of Land Development Area (154 Ha) of KIIC Area  PT. Karawang Tatabina  Master Plan & Detailed Design Oct-12  - May-13

32

 The Construction Supervision of Karawang Industrial Park (± 400 Ha) at Karawang, West Java Indonesia

 PT. Bintang Puspita Dwikarya

Construction Supervision

Oct-12

 -

 Feb-14

33

Flood Study Review at Deltamas City  (± 500 Ha), Cikarang, Bekasi, West Java

Deltamas

Review Study

Aug-12

 -

 Oct-12

34

Soil Investigation and Laboratory Test (Optional) GT Tire Area Karawang

PT Gadjah Tunggal

Soil Investigation

Jun-12

 -

 Aug-12

35

 Soil Investigation Works of Karawang Industrial Park

PT. Bintang Puspita Dwikarya

Soil Investigation

May-12

 -

 Jul-12

36

The Construction Supervision of KITIC Area Phase-2 Stage-1 at Deltamas City - Cikarang, Bekasi, West Java, Indonesia

KITIC

Construction Supervision

May-12

 -

 Dec-12

37

Detailed Design on ± 380 Ha Industrial Park in Karawang

PT. Bintang Puspita Dwikarya

Detailed Engineering Design

Apr-12

 -

 Nov-12

38

The Construction Supervision of KITIC Area (120 Ha) at Deltamas City - Cikarang, Bekasi, West Java, Indonesia

KITIC

Construction Supervision

Mar-12

 -

 Jul-12

39

GIIC Manual Book Preparation, Deltamas City

PT. Puradelta Lestari

Manual Book Preparation

Mar-12

 -

 Apr-12

 40

 Digital Topo Map Kopaskhas Land (250 Ha) Karawang International Industrial City

 KIIC

 Topographic Mapping

Feb-12

 -

 Mar-12

41

Review Layout Plan and 3D Image for NGK Project

Takenaka

Review Design

Feb-12

 -

 Mar-12

42

Detailed Design of Stage-4 Phase-1 (37 Ha) Karawang International Industrial City

KIIC

Detailed Design

Mar-12

 -

 May-12

43

Detailed Design of Phase 3 Stage 3 (60 Ha) Karawang International Industrial City

KIIC

Detailed Design

Mar-12

 -

 May-12

44

Detailed Engineering Design for Revitalization of Pond Upper River Ciater

BSD

Detailed Engineering Design

Feb-12

 -

 Apr-12

 45

 Topographical & River Surveys of Karawang Industrial Park

PT. Bintang Puspita Dwikarya

Topographic Survey

Feb-12

 -

 Mar-12

46

Master Plan Design of Karawang Industrial Park (380 Ha)

PT. Bintang Puspita Dwikarya

Master Plan & Design

Jan-12

 -

 Jul-12

47

BOQ and Cost Estimation for XD - Indonesia Transformer Factory in KITIC, Bekasi - Indonesia

China XD

Engineering Design

Feb-12

 -

 May-12

48

Joint Design for XD - Indonesia Transformer Factory in KITIC, Bekasi - Indonesia

China New Era

Engineering Design

Jan-12

 -

 Apr-12

49

Engineering Service of Construction Supervision Waste Water Treatment Plant (WWTP) Phase III for KIIC

KIIC

Engineering Design

Jun-11

 -

 May-12

50

Detailed Design for Stage 2 (Phase III) of Land Development for KTB

KIIC

Engineering Design

Mar-11

 -

 Apr-11

51

Preliminary Study on New East Jakarta Industrial Park in Republik of Indonesia

NK

Planning & Engineering Design

Feb-11

-

Mar-11

52

Preparing Design of Foundation of Equipment for PT. TEL Musi Pulp

TAKENAKA

Engineering Design

Feb-11

-

Mar-11

53

Study & Detailed Engineering of Deltamas City Phase 1 A

 Pura Delta Lestari

Detailed Engineering Design

 Oct-10

 -

 Feb-11

54

Detailed Engineering design of infrastructure GIIC Extension (200 Ha)

 Pura Delta Lestari

Detailed Engineering Design

 Sep-10

 -

 Sep-10

 55

Engineering Service of Land Development for KTB 314 Ha and Tanah Melingkar 24.6 Ha in Karawang International Industrial City (KIIC)

 KIIC

Engineering Planning

 Aug-10

 -

 Nov-10

 56

Detailed Design Planning for Cipamingkis Bridge, Drainage and Main Sewerage in GIIC Zone 1 (400 Ha) Deltamas Industrial Estate, Cikarang - West Java

Pura Delta Lestari

Detailed Engineering Design Planning

 Jun-10

 -

 Aug-10

 57

Main Drainage System and Grading Elevation Design in Jababeka 3 Industrial Estate and Cikarang Logistic Hub (CLH)

Jababeka

Planning & Engineering Design

Oct-09

-

Nov-09

58

Detailed Design for Cikarang Logistic Hub (CLH) for 2.6 Ha for Jababeka Industrial Estate Phase III

Jababeka

Engineering Design

May-09

-

Aug-09

59

Conceptual Master Plan for Cikarang Logistic Hub (CLH) 200 Ha for Jababeka Industrial Estate Phase III

Jababeka

Planning, Engineering Works

May-09

-

Aug-010

60

Structural Analysis of Factory Renovation, Cikarang Barat, Bekasi

PATCO

Engineering Design

Jul-07

-

Aug-07

61

Maintenance and Construction of Karawang International Industrial City (KIIC) Project Phase 1 & 2, West Java

MPIE

Construction Supervision

Jan-07

-

Jun-07

62

Design for Stage 3 Industrial Lot for Karawang International Industrial City (KIIC) Project, West Java

MPIE

Engineering Design

Dec-06

-

Apr-07

63

Design of Main Canal & Dike Pond 1 & 2 of Karawang International Industrial City (KIIC) Project, West Java

HAB'S & SON

Engineering Design

Feb-06

-

May-06

64

Maintenance and Construction of Karawang International Industrial City (KIIC) Project Phase I & Phase II, West Java

MALIGI

Operation & Maintenance

Jan-06

-

Dec-06

65

Maintenance and Construction of Karawang International Industrial City (KIIC) Project Phase I & Phase II, West Java

MALIGI

Maintenance & Construction Supervision

Jan-05

-

Dec-05

66

Constructed Infrastructure Facilities for MM 2100 Industrial Town Bekasi, West Java

MEGALOPOLIS

Operation & Maintenance

Apr-04

-

Aug-04

67

Maintenance and Construction of Karawang International Industrial City (KIIC) Project Phase I & Phase II, West Java

MALIGI

Maintenance & Construction Supervision

Jan-04

-

Dec-04

68

Maintenance and Construction of Karawang International Industrial City (KIIC) Project Phase I & Phase II, West Java

MPIE and
HAB'S & SON

Maintenance & Construction Supervision

Jan-03

-

Dec-03

69

Site Plan and Basic Design (50 Ha) and Detailed Design (10 Ha) for Deltamas Industrial Estate, Cikarang, West Java

DELTAMAS

Site Plan, Basic & Detailed Design

Jul-02

-

Oct-02

70

Supervision of Cut & Fill at 42Ha and Two Box Culverts, Design of Land Grading for 105Ha, Review Design of 42Ha and 14Ha for Bekasi Fajar Industrial Estate Project

BEKASI FAJAR

Construction Supervision, Engineering Design & Review

May-02

-

Aug-02

71

Maintenance and Construction of Karawang International Industrial City (KIIC) Project Phase 1 Stage 2 & Phase 2, West Java

HAB'S & SON

Maintenance & Construction Supervision

Jan-02

-

Dec-02

72

Detailed Design 30 Ha and Topographic Mapping 13 Ha of Bekasi Fajar Industrial Estate Project

BEKASI FAJAR

Detailed Design & Topographic Survey

Sep-01

-

Oct-01

73

Review of Existing Grading and Detailed Design for 30 Ha and Grading for 120 Ha and Supervision for Cut and Fill for 30 Ha for Bekasi Fajar Industrial Estate

BEKASI FAJAR

Design & Construction  Supervision

Jul-01

-

Oct-01

74

Construction of Karawang International Industrial City (KIIC) Project Phase I Stage 2 & Phase II, West Java

HAB'S & SON

Maintenance & Construction Supervision

Jan-01

-

Dec-01

75

Construction of Karawang International Industrial City (KIIC) Project Phase I Stage 2 & Phase II, West Java

HAB'S & SON

Maintenance & Construction Supervision

Jan-00

-

Dec-00

76

Cikarang Hijau Industrial Estate Development Project, Bekasi, West Java

CHI & NK

Preliminary Survey & Study

May-00

-

Jun-00

77

The Construction of Karawang International Industrial City (KIIC) Project Phase I Stage 2 & Phase II, West Java

HAB'S & SON

Maintenance & Construction Supervision

Dec-98

-

Jun-00

78

Construction of Karawang International Industrial City (KIIC) Project Phase I Stage 2 & Phase II, West Java

HAB'S & SON

Construction Supervision

Jul-98

-

Dec-98

79

Review of Drainage Capacity Indonesia Epson Industry Project, Cikarang, West Java

HTC

Engineering Design

Jan-98

-

Feb-98

80

Detailed Design for Package 2 (21Ha) and Package 3 (5Ha) in Stage 3 of Phase I Development of Karawang International Industrial City (KIIC)

MALIGI

Engineering Design & Construction Supervision

Oct-97

-

Apr-98

81

Detailed Design for Rental Factory Lot and Small Factory Lot in Phase I - Stage 3 - Package 3 Area of Karawang International Industrial City (KIIC), West Java

MALIGI

Basic & Detailed Design

Aug-97

-

Apr-98

82

Internal Infrastructure Design for Commercial Area of MM2100 Industrial Town Project Phase III, Bekasi - West Java

MEGALOPOLIS

Infrastructure Design

Jun-97

-

Jul-97

83

MM2100 Industrial Town Project Phase 3 of Civil Supervision and WTP Works, Bekasi - West Java

MEGALOPOLIS

Construction Supervision

May-97

-

May-98

84

MM2100 Industrial Town Project Phase III, Bekasi - West Java

MEGALOPOLIS

Construction Supervision

Feb-97

-

Apr-98

85

Supervision for the Construction of Karawang International Industrial City (KIIC)
Phase I Stage 2 Industrial Estate, West Java

MALIGI

Construction Supervision

Feb-97

-

Aug-98

86

The Construction of Karawang International Industrial City (KIIC) Project Phase 2, West Java

MALIGI and
HAB'S & SON

Construction Supervision

Jan-97

-

Jun-98

87

Design Work for Civil/Building Structures of Water Treatment Plant for MM2100 Industrial Town Project Phase III, Bekasi - West Java

EBARA

Engineering Design

Nov-96

-

Jan-97

88

Consulting Service for Second Industrial Work in Surabaya

JGC 

Construction Supervision & Management

Sep-96

-

Nov-96

89

Plant Construction of MM2100 Industrial Town Project Phase III, Bekasi - West Java

MEGALOPOLIS

Construction Supervision

Aug-96

-

Aug-97

90

Karawang International Industrial City (KIIC) Project Phase II, beside Toyota Area, West Java

HAB'S & SON

Construction Supervision & Management

May-96

-

May-97

91

Consulting Service for First Industrial Work in Paras, Surabaya

JGC 

Topographic Survey & Soil Investigation

Mar-96

-

May-96

92

Basic & Detailed Design and Construction Supervision of MM2100 Industrial Town Phase III, Bekasi - West Java

MEGALOPOLIS

Basic & Detailed Design, Construction Supervision

Feb-96

-

Oct-96

93

Detailed Design of Industrial and Housing Estate of Karawang International Industrial City (KIIC) Project Phase III, West Java

KTIE

Detailed Design

Feb-96

-

Sep-96

94

Soil Investigation for Bekasi Estate

DRP

Survey & Investigation

Feb-96

-

Apr-96

95

Soil Investigation Work for MM2100 Industrial Town Phase III, Bekasi - West Java

MEGALOPOLIS

Survey & Investigation

Feb-96

-

Apr-96

96

Detailed Design for the Remaining Area of 263 Ha of Karawang International Industrial City (KIIC) Phase II, West Java

HAB'S & SON

Detailed Design

Sep-95

-

Nov-95

97

Detailed Design for the Remaining Area of 236 Ha of Karawang International Industrial City (KIIC) Phase III, West Java

HAB'S & SON

Detailed Design & Construction Supervision

Aug-95

-

Oct-95

98

The Construction of Karawang International Industrial City (KIIC) Project Phase I Stage 2, West Java

MALIGI

Construction Supervision

May-95

-

Mar-97

99

Karawang International Industrial City (KIIC) Project Phase I Stage 2 and Phase 2

MALIGI

Detailed Design & Construction Supervision

May-95

-

Jan-97

100

The Construction of Karawang International Industrial City (KIIC) Project Phase II, West Java

HAB'S & SON

Construction Supervision

Jun-95

-

Dec-96

101

Detailed Design for Karawang International Industrial City (KIIC) Phase II, West Java

HAB'S & SON
and MALIGI

Detailed Design & Construction Supervision

Feb-95

-

Jun-95

102

Design of Karawang International Industrial City (KIIC) Project Package 2 and 3

MALIGI

Engineering Design

Nov-94

-

Dec-94

103

Design Work for the First Phase of Karawang Utama Industrial Estate

MALIGI/NK

Engineering Design

May-94

-

Jan-95

104

The Construction of Karawang International Industrial City (KIIC) Project Package 2 and 3, West Java

MALIGI

Construction Supervision

Feb-94

-

Oct-94

105

Karawang International Industrial City (KIIC) Project, West Java

MALIGI

Design & Construction

Dec-93

-

Nov-94

106

The Construction of Karawang International Industrial City (KIIC) Project Package 1, West Java

MALIGI

Construction Supervision

Sep-93

-

Oct-94

107

Cipta Cakra Murdaya Balaraja Industrial Estate Project, West Java

CCM/NK

Master Plan & Design

Mar-93

-

Aug-94

108

Bangun Lampung Semesta Reclamation Project, Lampung

BLS

Master Plan

Dec-92

-

May-93

109

Bekasi Commercial Area Development Project, Bekasi

BEKASI FAJAR

Topographic Survey

Oct-92

-

Jan-93

110

Bekasi Commercial Area Land Reclamation, Bekasi

MEGALOPOLIS

Construction Supervision

Oct-92

-

Dec-92


  © 2004 - 2010 PT Indokoei International. All Rights Reserved.