The objectives of the project are (1) to perform basic design of the project and related facilities involved to obtain further approval from the Client’s headquarter (2) to prepare detailed design drawing, technical specification, tender document for construction, cost estimation and detailed implementation program for realization of the project (3) to assist Client in tendering and conduct evaluation (4) to assist the Client in minor design modification if any (5) to assist Client during construction in form of periodical site visit (once in a week for 3 months in early of construction stage.
Industrial Estate
Warehouse at KITIC Area in Bekasi of West Java
The first foreign economic and trade cooperation Industrial Zone established