A.P. Pettarani Elevated Toll Road is built along ± 4.389 m length with Non-Budget Infrastructure Project (PINA) financing scheme and with construction period of 22 months. The width of the main road is 2 X 10.3 m with total pier of 82 piers. The toll road is elevated along Andi Pangeran Pettarani Street which will connect Maros – Sultan Hasanuddin International Airport – Toll Road Section I and II – Andi Pangeran Pettarani Street to Sultan Alaudin Street. The elevated toll road also has off/ on ramp lane in two points which are Boulevard Street and Sultan Alaudin Street with total length of ramp of ±2.467 m, total width of 8 m, and total pier of 54 piers. The Consulting service divides into 4 stages, which are Stage-1: Pre-Construction Services, Stage-2: Design Review, Stage-3: Construction Supervision and Stage-4: Post Construction Services including supervision of outstanding works & final inspection.